OUR Projects

Sustainable Energy Authority of Ireland
Sustainable Energy Authority of Ireland
Sustainable Energy Authority of Ireland

Dublin, Ireland

Client

SEAI

Architect:

EML

Services Consultant:

VARMING CONSULTANTS

Main Contractor:

FLYNN

Size:

N/A

Value:

€1,300,000

Accreditation:

N/A

Certification:

N/A

Description

Cobec Engineering pre qualified through the main contractor for this public works project and were appointed to deliver the electrical & mechanical installation contract for the new SEAI Ireland offices.

The project consisted of a full Cat B fit out to 2 floors of office space. All systems tested, commissioned, validated and demonstrated

Scope of Works

The electrical scope of works consisted of the following:

  • High and low level cable containment installation
  • LV Power installation
  • General service outlet installation
  • General and emergency lighting installations
  • Lighting control system
  • ICT structured cabling system installation
  • Fire alarm, protective services and evacuation systems installation

Scope of Works

The mechanical scope of works consisted of the following:

  • Modification of the drainage system
  • Air conditioning system installation
  • Complete plumbing installation
  • Chilled water and LPHW installation
  • Waste pump installation
  • Fan coil unit installation
  • BMS system installation and integration