OUR Projects


Dublin, Ireland
Client
Architect:
Services Consultant:
Main Contractor:
Size:
Value:
Accreditation:
Certification:
Description
Cobec Engineering tendered this project on a select list basis and were subsequently appointed to deliver the high specification electrical & ICT fit out Installation contract.
This installation was located within Central Park Block 1
Scope of Works
The electrical scope of works consisted of the following:
- High and low level cable containment installation
- General service outlet installation
- General and emergency lighting installations
- DALI lighting control system installation
- ICT structured cabling system installation
- Access control & security systems installation
- Fire alarm system and protective services installation
- Leak detection system installation
- UPS system installation
- BMS and mechanical wiring installation
- Tested, commissioned, validated and demonstrated