OUR Projects

Central Park H & I

Block H & I – Leopardstown, Dublin

Client

GREEN REIT PLC

Architect:

HENRY J LYONS

M&E Engineer:

AXISENG

Main Contractor:

COLLEN CONSTRUCTION

Size:

302,000 SQ FT

Value:

€7,500,000

Accreditation:

LEED GOLD

Certification:

BCAR

Description

Cobec Engineering tendered this project on a select tender list basis and were subsequently appointed to deliver the electrical & ICT installation contract for the shell & core and 2 level CAT A fit-out. This was a new build site in very close proximity to the operational Luas line to the south which required particular care and coordination.

Each block consisted of a 3 level basement and 7 floors above ground. A new security centre was built where all of the campus life critical systems were installed, tested, verified and handed over to the client.

Scope of Works

The electrical scope of works consisted of the following:

  • High and low level cable containment installation
  • MV power system installation
  • LV power system installation
  • General service socket outlets installation
  • General lighting and emergency lighting installation
  • Lighting controls system installation
  • ICT installation
  • Access control & security systems installation
  • Fire alarm system and protective services installation
  • Car park barriers installation
  • Induction loop system installation
  • Disabled refuge and toilet alarm systems installation
  • Tested, commissioned, validated and demonstrated