OUR Projects

CBD Aviation
CBD Aviation
CBD Aviation

1 Georges Quay, Dublin

Client

CBD AVIATION

Architect:

HENRY J LYONS

Services Consultant:

METEC

Main Contractor:

FLYNN

Size:

23,800 SQ FT

Value:

€1,450,000

Accreditation:

N/A

Certification:

N/A

Description

Cobec Engineering tendered this project on a select list basis and were subsequently appointed to deliver the high specification electrical & ICT installation contract for CBD Aviation on the penthouse floor of 1 Georges Quay.

As this building was partially occupied it required a high degree of coordination and site management to ensure minimal disruption to the operation of the existing tenants.

Scope of Works

The electrical scope of works consisted of the following:

  • High and low level cable containment installation
  • LV power system installation
  • General service outlet installation
  • General and emergency lighting installations
  • DALI lighting controls installation
  • Desk power services installation
  • ICT structured cabling system installation
  • Access control & CCTV systems installation
  • Fire alarm system and protective services installation
  • Leak detection system installation
  • BMS and mechanical wiring installation
  • Tested, commissioned, validated and demonstrated